Nothing slows traffic at the gate
No speed hump, table or rumble strip on the approach — vehicles reach the gate at full speed.
No physical speed-control devices (humps, tables, rumble strips) on either frontage at the gate or along visible approaches; carriageway flat throughout. Marked crossing at ~30m is flat, not a raised table. Far reaches (150m+) are unpaved lanes, also without devices.
